26702680-Work on the Central Tower of the new Forth Replacement Crossing, constructed on the old Beamer Rock onto which a cofferdam has been built to hold the reinforced concrete foundation and which

(No reviews yet) Write a Review
SKU:
26702680
£9.25 - £60.00

Description

Work on the Central Tower of the new Forth Replacement Crossing, constructed on the old Beamer Rock onto which a cofferdam has been built to hold the reinforced concrete foundation and which now rises part of the 250 metres out of the centre of the Firth of Forth. Pat Mackinnon from Inverness, who worked on the Skye Bridge and has built bridges around the world, on the birdcage of the Central T

Upload Date: 30 Dec 2013

Original Filename: 21387393730426.jpg

Store Filename: 26702680.jpg

Byline: Gordon Terris

Keywords: 21387393730426.jpg FORTH REPLACEMENT CROSSING CENTRAL TOWER CONCRETE MACKINNON ForthBridgeNEW15gt

About our products


Our box canvas products are handcrafted by our skilled and trained craftsman here in our NewsPrint Bureau. With box canvas quality checked for scratches and marks, we ensure that the product we produce is of the best possible quality.


As each image comes into the NewsPrint Bureau, our team of colour correction analysts check and correct each photograph for colour and brightness, making sure each print is picture perfect. Our photographic prints are finished in either Lustre or Glossy on Fuji DPII Archival Paper.





View AllClose